TB-22 (Sep 2022, DESY 24)
Check list
Scan runs
- Sensors
- Calice 72
Calice 73- Calice 74
- Calice 75
- Anton 1
- Yan 1
- BeamCal (Runs 4673-4680, Run 11)
- Sensor plus Tungstens
- Calice 74
- 5X0
- 1 to 15X0 (Runs 4735-4749)
- Yan 1
- 5X0
- 5 GeV (Runs 4688-4702, long run)
- 3 GeV (Runs 4703-4706)
- 1 GeV (Runs 4707-4714)
- 1 to 15X0 (Runs 4718-4731)
- 5X0
- Calice 74
FLAME gain test
Chronology
Day 1
- Setup & Connection
- Noise level check
- Telescope preparation
Day 2
- Setup & Connection
- Charge distribution: fitting with Landau-Gaussian convoluted function
- Telescope measured and load balance checked
- Test runs
- Empty event recheck
- Sensor-telescope temporal synchronisation
- Scan runs
- Calice 75
Day 3
- Sensor-telescope spatial synchronisation
- Scan runs
- Calice 75 (long run)
- Anton 1
- Yan 1
Day 4
- Scan runs
- Yan 1 (long run)
- Calice 74
- Calice 73 (not working)
- Calice 72
- Calice 74 with 5X0 W
Day 5
- Scan runs
- Calice 74 with 5X0 W (long run)
- BeamCal
- Yan 1 with 5X0 W
- Yan 1 with 15X0 W
- FLAME gain test
Day 6
- Scan runs
- Calice 74 with 15X0 W
- Dismantlement