TB-22 (Sep 2022, DESY 24)

Check list

Scan runs

  • Sensors
    • Calice 72
    • Calice 73
    • Calice 74
    • Calice 75
    • Anton 1
    • Yan 1
    • BeamCal (Runs 4673-4680, Run 11)
  • Sensor plus Tungstens
    • Calice 74
      • 5X0
      • 1 to 15X0 (Runs 4735-4749)
    • Yan 1
      • 5X0
        • 5 GeV (Runs 4688-4702, long run)
        • 3 GeV (Runs 4703-4706)
        • 1 GeV (Runs 4707-4714)
      • 1 to 15X0 (Runs 4718-4731)

FLAME gain test

Chronology

Day 1  

  • Setup & Connection
    • Noise level check
    • Telescope preparation

Day 2  

  • Setup & Connection
    • Charge distribution: fitting with Landau-Gaussian convoluted function
    • Telescope measured and load balance checked
    • Test runs
  • Empty event recheck
  • Sensor-telescope temporal synchronisation
  • Scan runs
    • Calice 75

Day 3  

  • Sensor-telescope spatial synchronisation
  • Scan runs
    • Calice 75 (long run)
    • Anton 1
    • Yan 1

Day 4  

  • Scan runs
    • Yan 1 (long run)
    • Calice 74
    • Calice 73 (not working)
    • Calice 72
    • Calice 74 with 5X0 W

Day 5  

  • Scan runs
    • Calice 74 with 5X0 W (long run)
    • BeamCal
    • Yan 1 with 5X0 W
    • Yan 1 with 15X0 W
  • FLAME gain test

Day 6  

  • Scan runs
    • Calice 74 with 15X0 W
  • Dismantlement