Important informations/settings and pending issues.
DateWhereWhatWho
07.09.23FL2 In case of another polarix water flow error, please take some pictures of the Rotameter (Durchflussmesser) BEFORE the valve is opened and send it to TC

05.06.2023Geb.28MSL cleanroom On-call service  0160-3643191TCs
06.04.23FLASHD1IDUMP, QLN1 and QLS1 werden durch den Sequenzer gefahren & muessen danach wieder zu Null gecycled werden bzw. zu Null gesetzt werden.ZEM
10.03.23FLASHIf a magnet-cycling is needed during the weekend: please inform the MPC-shiftcrew before cycling. They want to check/reset the "Kreisentregung" for some certain magnets.MFL
17.2.23FLASHInform cryo control room before ramping up and down RF    Tel.: 3923MFL
29.11.22FLASH

In case of Klystron ACC45 HV problems:

  • ramp down HV
  • Switch off
  • Reset
  • Switch on
  • Ramp up
  • In case of problems call 3994 (T.Froelich) during daytime
T.Froelich MHF
17.10.22FLASHNew TC-Phonenumber: 1753MFL
14.10.22FLASHThe startup/shutdown sequences in the Sequencer are still not working properlyMFL
27.09.19FLASHANY technical work or ZZ request during machine operation SHOULD be sent to tc-flash@desy.de !

TCs

 Coordination Phone-numbers:

Contact:Phone-number

Run-coordinator

1751

Photon-ccordinator

4455

Technical Coordinator

1753

BL1 2604Control room 1752
BL2 6188FL22 1752

BL3 5066

FL24 5064
PG1 1904FL26 4536
PG2 1915
PPLaser 4523
Exp.Hall 3817/3903/3905/1523
  • No labels