Pict. taken during the beam time at TB21 in Sep-Oct 2015
Overview of the TB21 hall.
MCz200P(irr. 1.3e16cm^-2)
Telescope with the DUT.
Alibava Busy signal should be with 50 Ohm termination.
Overview of the TB21 hall.
MCz200P(irr. 1.3e16cm^-2)
Telescope with the DUT.
Alibava Busy signal should be with 50 Ohm termination.