Page contents
- Standalone software
- Bring up to life an HBU (USB based)
- Calibration Procedures
- Simulation
- Reconstruction
- Softwares for the Delay Wire Chambers
- Data Acquisition (DAQ)
- Analysis
- Cooling
- AHCAL swiching on/off
- DQM4HEP
- Fast AT Pedestal Extraction
- Passports
The CALICE AHCAL engineering prototype is a realistic prototype with fully integrated read-out electronics, incorporating over 23'000 latest-generation SiPMs. It was constructed during the year 2017-2018 and put in beam at CERN in May and June 2018. The prototype has over 38 layers, each equipped with 576 scintillator tiles of 3x3 cm2 size.